• Nearly 6.2 million sq. ft. of Dallas/Fort Worth industrial space was absorbed during the first 90 days of 2020.
  • The market-wide vacancy rate decreased by nine basis points (bps) from the previous quarter to 5.7%.
  • Product under construction totaled 23.9 million sq. ft. and was 19.3% pre-committed.
  • Quarter deliveries totaled 5.5 million sq. ft. and were 39.4% pre-committed.